Services

Gate valve and water main installation on an external water reticulation package in Johor
Key Benefits

Incoming mains, external reticulation and tanks.

SPAN and SAJ coordination and submissions.

Pressure testing and commissioning.

As-built documentation and authority handover.

Sewer pipe laying in an open trench on a sewerage reticulation package in Johor
Key Benefits

Sewer reticulation, main lines and manholes.

JPP and IWK design compliance.

Trenchless crossings where needed.

CCTV inspection and IWK handover.

Precast concrete drain installation on a township drainage package in Johor
Key Benefits

Stormwater drains, culverts and outfalls.

Sub-soil and surface drainage.

Same crews, same trench as your water and sewerage pipes.

Testing and authority handover.

Pipe jacking cutter head lowered into a launch shaft for trenchless pipeline installation
Key Benefits

No road closure, no diversion, minimal disruption.

100mm to 2400mm, single drives beyond 300m.

Works safely beneath piles, services and foundations.

Imported hydrostatic rigs, capable in wet ground.

Aeration tank at a sewerage treatment plant built and commissioned by Khidmat Hijau
Key Benefits

Design and build under one contract.

Process, civil and M&E in one scope.

Intermediate pumping stations and soil drainage.

Tested, commissioned and handed over to IWK.

HOW WE WORK

From Tender to Handover

Infrastructure pipework lives or dies on coordination. Our process is built around authority compliance, controlled delivery and documented handover, so your programme stays on track and your as-builts are ready when you need them.

Scroll to Top