Trenchless Pipe Jacking Contractor in Malaysia
Cross roads, rail, rivers and live infrastructure with no excavation. Diameters from 100mm to 2400mm, single drives beyond 300m, curved drives available.
When a pipeline has to pass under a highway, a rail corridor, a river or a building foundation, open-cut is not an option. Our in-house pipe-jacking rigs push the pipe through the ground from a launch shaft, leaving the surface above untouched.
顶管作业井 Jacking Pit
从井口往下拍或斜拍,要看到顶管机 / 千斤顶 / 导轨在井里。全套 PPE。横图 ≥2000px
Minimal Disruption
A small working footprint. No road closure, no diversion, no months of public inconvenience.
Cost Effective
No excavation and no reinstatement of road pavement, kerbs or landscaping.
Safe
Works beneath bridge piles, existing services and building foundations without exposing them.
Environmentally Sound
Far less spoil generated and hauled away.
Scope of Work
- Highway and road crossings
- Railroad crossings
- River and canal crossings
- Marine intake and outfall
- Launch and reception shaft construction
- Curved and long-drive jacking
Capability
| Diameter range | 100mm to 2400mm |
| Single drive length | Beyond 300m (Long Jack) |
| Curved drives | Yes |
| Crossings | Highway, railroad, river, marine intake and outfall |
| Rigs | Imported hydrostatic counter-balance jacking machines, capable of operating in wet ground |
In-House, Not Subcontracted
Our jacking rigs and crews are our own. The trenchless crossing on your programme is not a package we hand to someone else and hope for.
大口径管节
等待顶进的混凝土 / 钢管节特写,最好能看出直径(可放安全帽或人在旁边作参照)。横图 ≥2000px
Proven In The Field
Trenchless crossings delivered on the JB-Singapore RTS Link, the Gemas to Johor Bahru electrified double-track rail project, and integrated water supply schemes in the Klang Valley.
Have a Crossing That Cannot Be Dug Up?
Send us the alignment and ground conditions. We will come back with a method and a programme.