SEWERAGE TREATMENT PLANT

Sewerage Treatment Plant Contractor in Malaysia

Design and build of sewerage treatment plants, waste water treatment plants and intermediate pumping stations. CIDB G7, JPP and IWK registered.

We design and build the treatment plants and pumping stations that close the loop on a development’s sewerage system, from process design through construction, testing and commissioning to IWK handover.

[待补图片 P-13]
污水处理厂 · 全景
已建好的污水处理厂或中途泵站外观。横图 ≥2000px

Design and Build Under One Contract

Process design, civil works and installation held by one contractor, so the responsibility does not split.

Process, Civil and M&E in One Scope

Tanks, blowers, pumps and controls delivered as a working plant, not as separate trades.

Commissioned and Handed Over to IWK

Testing, commissioning and documentation completed to IWK requirements.

Scope of Work

  • Sewerage treatment plant (design and build)
  • Waste water treatment plant
  • Intermediate pumping station
  • Soil drainage systems
  • Testing, commissioning and IWK handover

Network and Plant, One Contractor

The same contractor that laid your reticulation builds the plant it feeds. No interface gap between network and plant.

[待补图片 P-14]
污水处理厂 · 设备
泵组、鼓风机房、池体结构,或施工中的钢筋混凝土池。全套 PPE。横图 ≥2000px

Proven In The Field

Treatment plant works delivered for state water asset programmes and for strata housing developments in Johor.

Planning an STP or Pumping Station?

One CIDB G7 contractor, from process design to IWK handover.

REQUEST A QUOTE

Scroll to Top