TRENCHLESS PIPE JACKING

Trenchless Pipe Jacking Contractor in Malaysia

Cross roads, rail, rivers and live infrastructure with no excavation. Diameters from 100mm to 2400mm, single drives beyond 300m, curved drives available.

When a pipeline has to pass under a highway, a rail corridor, a river or a building foundation, open-cut is not an option. Our in-house pipe-jacking rigs push the pipe through the ground from a launch shaft, leaving the surface above untouched.

[待补图片 P-11]
顶管作业井 Jacking Pit
从井口往下拍或斜拍,要看到顶管机 / 千斤顶 / 导轨在井里。全套 PPE。横图 ≥2000px

Minimal Disruption

A small working footprint. No road closure, no diversion, no months of public inconvenience.

Cost Effective

No excavation and no reinstatement of road pavement, kerbs or landscaping.

Safe

Works beneath bridge piles, existing services and building foundations without exposing them.

Environmentally Sound

Far less spoil generated and hauled away.

Scope of Work

  • Highway and road crossings
  • Railroad crossings
  • River and canal crossings
  • Marine intake and outfall
  • Launch and reception shaft construction
  • Curved and long-drive jacking

Capability

Diameter range 100mm to 2400mm
Single drive length Beyond 300m (Long Jack)
Curved drives Yes
Crossings Highway, railroad, river, marine intake and outfall
Rigs Imported hydrostatic counter-balance jacking machines, capable of operating in wet ground

In-House, Not Subcontracted

Our jacking rigs and crews are our own. The trenchless crossing on your programme is not a package we hand to someone else and hope for.

[待补图片 P-12]
大口径管节
等待顶进的混凝土 / 钢管节特写,最好能看出直径(可放安全帽或人在旁边作参照)。横图 ≥2000px

Proven In The Field

Trenchless crossings delivered on the JB-Singapore RTS Link, the Gemas to Johor Bahru electrified double-track rail project, and integrated water supply schemes in the Klang Valley.

Have a Crossing That Cannot Be Dug Up?

Send us the alignment and ground conditions. We will come back with a method and a programme.

REQUEST A QUOTE